Plan Approval Fee
« Back to Glossary Index
A county-levied charge calculated either per square meter of the total plinth area or as a baseline percentage (typically 0.1% to 1%) of the estimated construction cost.
« Back to Glossary IndexA county-levied charge calculated either per square meter of the total plinth area or as a baseline percentage (typically 0.1% to 1%) of the estimated construction cost.
« Back to Glossary Index